VRV System Installation at Sena Shoe Palace - Ganemulla
Project Duration 3 WeeksProject Overview
Mega Power (PVT) LTD was proudly selected as the specialized MEP subcontractor by the main contractor, Ji Air Conditioning, to execute the installation of a high-performance VRV climate control system for the Sena Shoe Palace. Our team is fully responsible for the hands-on engineering, piping layout, outdoor unit integration, and system commissioning.